Recently, Guohua Energy Investment Co. Ltd. started the first batch of wind power tower procurement in 2021. The project includes 78 sets of tower, with a total of 285MW.
Total capacity (MW) | Tower height(m) | Turbinenumber | Delivery date | |
Project 1 | 55 | 110 | 12 | October 1, 2021-November 30, 2021 |
Project 2 | 80 | 100 | 21 | September, 2021-November, 2021 |
Project 3 | 150 | 95 | 45 | August, 2021-November 30, 2021 |
The scope of bidding includes all work related material procurement, manufacturing and assembly, and transportation of wind turbine tower and accessories.
The main work includes but is not limited to:
1. Main body of wind turbine tower;
2. Tower flange;
3. Procurement and assembly of tower accessories (cable clamp, cable tray, aluminum alloy ladder, fall prevention system and other interior accessories, platform, tower lighting (LED with emergency light function), socket cable and other electrical accessories, fire extinguisher, etc.); manufacturing and installation of cable hole tray for each platform.
4. Transportation support and other auxiliary equipment;
5. Factory acceptance, packaging, transportation to destination;
6. Providing factory drawings and data;
7. Welding of grounding device;
8. On-site technical service, etc.
Source: www.dlzb.com
Edited and translated: Following The Wind