Keywords: CSSC, 5MW onshore wind turbine
Text:
Recently, China CSSC (Haizhuang) successfully installed its first onshore 5MW platform – H155-5MW wind turbine in Zhangbei wind farm.
![](http://following-the-wind.com/wp-content/uploads/2021/03/微信图片_20210316130020-768x1024.jpg)
The installation took only 5 days, and the prototype installation record was refreshed.
Source:CSSC
Edited and translated: minds:connected