State Power Investment Corporation – 1.4GW wind power base construction, bid price of 3047-3290 yuan/kW Post author:Cuimei Zhang Post published:2020-08-03 Post Category:News You Might Also Like Huaneng Successfully Issued The First Batch Of Carbon Neutrality Green Bonds 2021-03-01 Haizhuang’s First 6.2MW Wind Turbine Unit With Localized Main Control System Was Put Into Operation 2021-06-01 Sany Heavy Energy Launched 2 New Turbine Models For Ultra-Low Wind Speed 2021-09-10
Haizhuang’s First 6.2MW Wind Turbine Unit With Localized Main Control System Was Put Into Operation 2021-06-01