Report on the Work of the Government 2020 Post author:Cuimei Zhang Post published:2020-08-03 Post Category:News http://following-the-wind.com/wp-content/uploads/2020/07/REPORT-ON-THE-WORK-OF-THE-GOVERNMENT.pdf Buy me a coffee You Might Also Like Vestas to install V236-15.0 MW prototype turbine at Østerild in Denmark 2021-10-19 Aeolon Plans To Enter IPO 2021-08-11 Final Assembly And Test Of V-type 12MW Floating Wind Turbine In Qingdao 2020-08-11